
St George Mining Ltd (ASX:SGQ, FRA:S0G, OTC:SGQMF) has delivered its thickest and most compelling drill result yet from the Araxá Rare Earths and Niobium Project in Brazil, with a standout intercept of 178.7 metres at 4.34% total rare earth oxides (TREO) and 0.75% niobium oxide (Nb₂O₅) from surface.
The result — the thickest mineralised interval recorded at Araxá to date — underscores the scale, grade and near-surface continuity of the deposit, reinforcing its status as one of the most significant undeveloped rare earths and niobium projects globally.
It forms part of a broader batch of assay results from 15 diamond drill holes, with multiple wide, high-grade intercepts continuing to demonstrate consistency across the system.
Oblique section showing the latest diamond drill holes as well as other significant drilling completed in the current campaign. The latest drill holes with red labels.
Among the highlights:
-
165.3m at 4.28% TREO and 0.61% Nb₂O₅ from surface
-
150.2m at 4.64% TREO and 0.59% Nb₂O₅ from surface
-
163.65m at 3.29% TREO and 0.45% Nb₂O₅ from surface
-
81.05m at 5.14% TREO and 0.64% Nb₂O₅ from surface
These results continue to highlight a defining feature of Araxá — very thick, high-grade mineralisation starting at surface, supporting the potential for a low-strip, open-pit mining operation.
Section A – A’ showing high-grade TREO intercepts (cut-off 1% TREO) and high-grade Nb2O5 intercepts (cut-off 0.2% Nb2O5) along with the existing MRE outline.
Executive chairman John Prineas said the combination of scale and grade, particularly from surface, sets Araxá apart from comparable projects.
“The drilling results continue to show huge true widths from surface paired with very high grades,” he said.
“This unique combination is unrivalled among emerging rare earths and niobium developers,” he added. “The commercial advantage of high-grade mineralisation starting from surface — as opposed to 50 metres or even more than 100 metres below surface — cannot be underestimated.”
Section B – B’ showing high-grade TREO intercepts (cut-off 1% TREO) and high-grade Nb2O5 intercepts (cut-off 0.2% Nb2O5) along with the existing MRE outline, showing the expansion of the existing MRE.
High-grade system continues to expand
Drilling at Araxá has now been running continuously for more than six months, with the current program designed to both expand and upgrade the mineral resource estimate.
The latest results demonstrate strong grade continuity over broad intervals and suggest further upside, with the mineral system remaining open in all directions and at depth.
LATEST POSTS
- 1
The Tiny Channel Island With 65 Residents That Chefs And Foodies Go Out Of Their Way To Visit - 2
Fundamental Venture The board Apparatuses for Remote Groups - 3
In blow to Lula, Brazil Congress revives controversial environmental bill - 4
'We are ready': NASA still on track to launch Artemis 2 astronauts to the moon April 1 - 5
Struggling to keep your New Year's resolutions? Here's how to keep yourself on track
Electric Vehicles for Eco-Accommodating Driving
From Representative to Business visionary: Private issue Victories
Study shows no clear link between low-fat dairy and dementia risk
Last supermoon of the year, the cold moon, seen across the U.S.: See the photos
REWE launches seventh Pick&Go test store in Hanover
What to watch for in weight loss drugs in 2026
Doctors say changes to US vaccine recommendations are confusing parents and could harm kids
Moon rush: These private spacecraft will attempt lunar landings in 2026
Zelensky names spy chief to head presidential office after corruption row













